The construction of an industrial metalworking complex, within the framework of the general investment program of RAGNIT Holding, involves the creation of a flexible production system for processing sheet and high-quality metal for Holding projects - shipbuilding, RVK industry, high-rise construction and engineering structures.
Metal processing and creation of units, parts, sections, metal structures, etc. will be carried out at the production facilities of the complex. for all projects of RAGNIT Holding. At the same time, the equipment of the complex will allow to process any kind of steel, aluminum and aluminum alloys, copper, other metals and alloys.
After the initial technological processing of rolled metal, the parts will go to the welding production zone, where sections and metal structures will be made from nodes and parts, taking into account the possibilities of transporting them by rail and road. If necessary, assembly of large-sized, indivisible structures, RVK products will be used for their transportation.
Estimated volumes of rolled metal processing, after the complex reaches full capacity, up to 25,000 tons per year.